Joinery is one of the biggest single costs in a new Australian home. Kitchen, butler’s pantry, robes, vanities and laundry together can easily pass the price of a new car. Many owners and builders now compare three options: a local cabinet maker, a flat-pack system, or custom cabinetry made in Foshan and shipped in. This guide puts real numbers side by side for a typical 4-bedroom home, so you can see where the savings come from and where they disappear.
It is written for homeowners, owner-builders, small builders and developers planning a new build or a full renovation. We set out the scope we used, indicative price ranges for each option, a full landed-cost breakdown for an import from China, a worked example, the Australian compliance points that affect price, realistic lead times, a step-by-step plan, a checklist and the mistakes that most often wipe out the savings. All figures are typical 2026 ranges for planning, not quotes.
Key points
- For a mid-range 4-bedroom home, local custom joinery for the kitchen, robes, vanities and laundry often lands around AUD 46,000 to 107,000 installed, before benchtops and appliances.
- The same scope made to order in Foshan typically costs AUD 12,000 to 31,000 at the factory. Once freight, GST, port charges, installation and contingency are added, the total is often 30% to 50% below a comparable local quote.
- Wooden kitchen and bedroom furniture from China has a general duty rate of 5%, which usually falls to 0% with a valid China–Australia Free Trade Agreement (ChAFTA) certificate of origin. GST of 10% applies on top.
- Flat-pack is cheapest up front, but sizes, finishes and layout flexibility are limited, and installation is usually extra.
- Importing adds about 6 to 10 weeks to the programme. Lock in the design early, because changes after production starts are expensive.
- Benchtops are usually best sourced locally. Engineered stone has been banned in Australia since 1 July 2024, including imports from 1 January 2025.
In this guide
- The 4-bedroom home we priced
- Price comparison: local, flat-pack and Foshan
- What goes into the landed cost
- Worked example for a full house
- Where the savings come from, and where they don’t
- Compliance points that affect price
- Lead times compared
- Step-by-step plan
- Checklist before you pay the deposit
- Mistakes to avoid
- FAQ
The 4-bedroom home we priced
A fair comparison needs the same scope on every quote. We based the figures on a typical new 4-bedroom, 2 to 3 bathroom house of around 220 to 280 m², finished to a mid-range standard. That means soft-close hinges and drawers, a durable laminate, melamine or 2-pac finish, and moisture-resistant board in wet areas.
- Kitchen: about 5 to 6 metres of base and overhead cabinets, a tall pantry and appliance tower, plus an island of around 2.4 to 3 metres.
- Butler’s pantry: optional, with base cabinets and open shelving.
- Robes: one walk-in robe for the main bedroom and three built-in robes with sliding or hinged doors.
- Vanities: two or three wall-hung or floor-standing vanities, including a double vanity in the ensuite.
- Laundry: base cabinets, overheads and a tall broom cupboard.
Benchtops, sinks, tapware, appliances, lighting and electrical work are excluded from the main comparison because they are usually bought the same way whichever cabinet option you choose. Our guide to cabinet dimension standards covers the typical heights and depths Australian kitchens are built to.
Price comparison: local, flat-pack and Foshan
The table compares like for like. Local custom and flat-pack prices are typical installed prices in a capital city, including GST. Foshan prices are factory prices (FOB China) in Australian dollars, before freight, GST and installation, which we add in the next section.
| Area | Local custom joinery, installed (AUD) | Flat-pack, supplied and installed (AUD) | Made in Foshan, factory price (AUD) |
|---|---|---|---|
| Kitchen with island | 20,000 to 45,000 | 8,000 to 18,000 | 5,000 to 12,000 |
| Butler’s pantry (optional) | 6,000 to 15,000 | 2,500 to 6,000 | 1,500 to 4,000 |
| Three built-in robes | 7,500 to 15,000 | 3,000 to 7,500 | 2,000 to 5,000 |
| Walk-in robe | 5,000 to 12,000 | 2,000 to 5,000 | 1,500 to 4,000 |
| Two to three vanities (cabinet only) | 4,500 to 12,000 | 1,500 to 4,500 | 1,200 to 3,500 |
| Laundry | 3,000 to 8,000 | 1,200 to 3,500 | 800 to 2,500 |
| Total | 46,000 to 107,000 | 18,200 to 44,500 | 12,000 to 31,000 |
Indicative 2026 ranges only. Prices vary with city, finish, hardware brand, design complexity and order size. Use them for budgeting, then get written quotes on the same drawings.
The factory column is not the price you pay. It is the starting point. For a fair comparison, every import cost must be added on top. For a deeper look at the kitchen on its own, see our guide to importing kitchen cabinets to Australia, and for bedroom storage, our guide to wardrobes from China to Australia.
What goes into the landed cost
The landed cost is everything you pay to get the cabinets from the factory to installed in your house. The Australian Border Force explains the import charges on its cost of importing goods page. For a house lot of joinery, the main lines are:
| Cost line | Typical range or rule | Notes |
|---|---|---|
| Factory price (FOB China) | See the table above | Includes export packing and delivery to the port |
| Sea freight and insurance | AUD 2,500 to 5,000 for a 20-foot container; more for a 40-foot | A full house of flat-packed carcasses often fits in a 20-foot container |
| Customs duty | 5% general rate, usually 0% with ChAFTA origin | Wooden kitchen furniture, bedroom furniture and parts are listed in chapter 94 of the Customs Tariff |
| GST | 10% | Charged on the customs value plus duty, freight and insurance |
| Port, customs clearance and biosecurity | AUD 1,500 to 2,500 | Broker, terminal and document charges; more if goods are inspected |
| Delivery to site | AUD 600 to 1,200 | Side-loader or tailgate truck and unloading |
| Quality inspection and samples | AUD 800 to 2,000 | Pre-shipment inspection and courier of finish samples |
| Local installation | AUD 7,000 to 12,000 | Kitchen, robes, vanities and laundry by a local installer |
| Contingency | About 5% to 10% | Covers inspections, storage, damaged panels or small extras |
The China–Australia Free Trade Agreement has been in force since December 2015. To claim the 0% rate, the factory or its export agent must issue a valid certificate of origin, and your broker must claim it at entry. Without it, you pay the 5% general rate. Our guide to the real cost of importing furniture from China explains each line in more detail.

Worked example for a full house
Here is a mid-range example for the full scope above, with a factory price of AUD 20,000 shipped to Sydney, Melbourne or Brisbane in one 20-foot container.
| Item | With ChAFTA certificate (AUD) | Without certificate (AUD) |
|---|---|---|
| Cabinetry, doors and hardware, FOB Foshan | 20,000 | 20,000 |
| Sea freight and insurance | 3,500 | 3,500 |
| Duty at 5% of customs value | 0 | 1,000 |
| GST at 10% (on value, duty, freight and insurance) | 2,350 | 2,450 |
| Port, clearance and biosecurity charges | 2,000 | 2,000 |
| Delivery to site | 800 | 800 |
| Quality inspection and samples | 1,200 | 1,200 |
| Local installation | 9,000 | 9,000 |
| Contingency at about 5% | 1,950 | 2,000 |
| Indicative installed cost | 40,800 | 41,950 |
Example only. Exchange rates, freight markets, inspections and design changes all move the result. GST-registered builders and developers can usually claim the GST back. Homeowners usually cannot, so we included it here, just as it is included in local quotes.
A comparable local custom quote for this scope at mid-range spec is often around AUD 60,000 to 80,000. A flat-pack fit-out is often around AUD 28,000 to 35,000, but with standard sizes and a narrower choice of finishes. In this example, the imported option comes in roughly AUD 19,000 to 39,000 below the local quote, while keeping fully custom sizes and finishes.
Where the savings come from, and where they don’t
Foshan has one of the largest clusters of cabinet factories in the world. Factories buy board, edging and hardware in very large volumes and run automated CNC cutting, edge banding and drilling lines. Labour and workshop costs are also lower. That is why the factory price is a fraction of a local workshop price for the same drawings.

The savings shrink, or disappear, in these situations:
- Very small orders. A single vanity or laundry carries the same clearance and delivery costs as a whole house, so the savings rarely justify importing.
- Late design changes. Once panels are cut, changes mean new parts and possibly a second shipment.
- Poor site measurement. Cabinets built to plan sizes that do not match the built walls need on-site modification by your installer.
- Cheap boards and hardware. The lowest quotes often use non-moisture-resistant board or unbranded runners. Read our guide to cabinet hardware systems before you compare prices.
- No local installer lined up. Imported cabinets still need a capable installer. Book one before the goods arrive.
Flat-pack is a sensible choice when the budget is tight and standard sizes fit your plan. Local custom joinery makes sense for complex one-off designs, tight timelines or projects where the cabinet maker also handles site measuring and installation under one contract. Importing makes the most sense for a whole house, a set of townhouses or a builder’s repeat designs.
Compliance points that affect price
Cabinets do not need a single import approval, but several Australian rules affect specification and cost. Build them into the quote from the start, so there are no surprises at the port or on site.
- Cabinet construction and installation. AS 4386 sets minimum requirements for cabinetry in the built-in environment, covering kitchens and built-in furniture, including strength, durability, safety and installation. Ask for drawings and specifications that reference it.
- Formaldehyde emissions. Specify E0 or E1 rated particleboard and MDF and ask for test reports from a recognised laboratory. The Engineered Wood Products Association of Australasia publishes guidance on panel emissions and product certification.
- Moisture-resistant board. Use moisture-resistant board for sinks, vanities and laundries. It costs a little more and prevents swelling.
- Timber biosecurity. The Department of Agriculture’s timber import conditions set out what applies to timber products. Solid timber crates and pallets must be treated and marked to ISPM 15. Wooden furniture can also fall under Australia’s illegal logging laws, so keep timber source records.
- Seasonal pest measures. During the brown marmorated stink bug season from 1 September to 30 April, China is currently listed as an emerging risk country. Furniture shipments can be selected for random inspection, which can add cost and delay.
- Asbestos. Australia prohibits the import of goods containing asbestos. Cabinet boards rarely contain it, but ask for supplier declarations on boards, backing panels and any fibre cement parts.
- Benchtops. Safe Work Australia’s engineered stone ban means you cannot import or install engineered stone benchtops. Most projects template and fit natural stone, porcelain, sintered stone or laminate tops locally after the cabinets are installed. Our guide to kitchen countertops from China covers the options.
- Electrical items. Integrated LED strips, drivers and power points in cabinets must be suitable for Australia and installed by a licensed electrician. Many buyers source these locally.
Durable finishes also affect long-term value. Our guide to cabinet finish durability compares melamine, laminate, 2-pac and veneer.
Lead times compared
| Stage | Local custom joinery | Made in Foshan |
|---|---|---|
| Design, drawings and sign-off | 2 to 4 weeks | 2 to 4 weeks |
| Finish samples and approval | About 1 week | 2 to 3 weeks, including courier |
| Production | 4 to 8 weeks | 4 to 6 weeks |
| Shipping and clearance | Not needed | 3 to 5 weeks to the east coast; longer to Perth |
| Installation | 1 to 2 weeks | 1 to 2 weeks |
| Typical total | 8 to 14 weeks | 12 to 20 weeks |
The practical rule is to place the order once the frame is up and the wall positions are fixed, and to ship so the cabinets arrive after plastering and waterproofing. That way your builder is not waiting on joinery.

Step-by-step plan
- Fix the scope. List every joinery area, with sizes, finishes and hardware, and decide what will be bought locally, such as benchtops, sinks and appliances.
- Get comparable quotes. Ask a local cabinet maker, a flat-pack supplier and a Foshan factory to quote on the same drawings and specification.
- Check the specification. Confirm board type and emission class, moisture-resistant board for wet areas, edging thickness, hardware brand and door construction. Our guide to frameless and framed cabinets helps here.
- Measure the site. Have the builder or installer check measurements once the walls are framed or sheeted, and update the shop drawings.
- Approve samples. Approve physical door and board samples, plus a sample drawer and hinge set, before production.
- Book an installer. Choose a local installer early. Ask whether they are a member of the Housing Industry Association or Master Builders Australia, and confirm any licence your state requires.
- Inspect before shipping. Check sizes, finishes, hardware, labelling and packing against the order before the balance is paid.
- Clear and deliver. Give your customs broker the invoice, packing list, certificate of origin and treatment certificates early, so the container clears without delay.
- Install and close out. Install cabinets, then template and fit benchtops, then complete plumbing and electrical fit-off.
Checklist before you pay the deposit
- Every room is drawn with final sizes in millimetres, and the drawings are signed off by you and your builder.
- The quote lists board type, thickness, emission class and moisture-resistant areas.
- Hardware brand, runner type, hinge type and soft-close are named, not just “premium hardware”.
- Door finish, edge profile and colour are confirmed against a physical sample.
- Each cabinet is labelled by room and position, with an assembly plan for the installer.
- Packing is specified for sea freight, with corner protection and ISPM 15 marked pallets.
- The factory can issue a ChAFTA certificate of origin.
- Payment terms link the balance to a passed pre-shipment inspection.
- Spare doors, hinges, screws and edging are included for site fixes.
- Your installer and benchtop supplier are booked for the arrival window.

Mistakes to avoid
- Comparing a factory price with an installed local price. Always compare installed, GST-inclusive totals.
- Leaving out the certificate of origin. Without it you pay 5% duty that you could usually avoid.
- Ordering from plan sizes. Built walls are rarely exactly as drawn. Measure on site before production.
- Shipping engineered stone tops. They are prohibited imports. Plan benchtops locally.
- Ignoring wet-area board. Standard particleboard under a sink or in a laundry can swell within a few years.
- No contingency. A random biosecurity inspection or a few damaged panels can easily cost more than the 5% you saved by skipping it.
- Splitting the house into many small orders. One consolidated shipment keeps clearance and delivery costs low.
- Choosing the cheapest factory on price alone. Check finish quality, hardware and packing on real samples first. Our tips on cost-saving strategies for importing furniture from China show where it is safe to save.
How Sorse helps with whole-house joinery
We are based in Foshan and work with Australian homeowners, builders and developers on kitchens, robes, vanities and laundries. We match your drawings to factories that build well for the Australian market, check boards, hardware and finishes against your specification, approve samples, inspect production and packing, and prepare documents for your broker. The aim is joinery that meets Australian requirements, arrives on time and lands at a cost you can plan for. Our guide to importing kitchen cabinets and wardrobes from China to Australia covers the full process, and our guide to sourcing bathroom vanities from China covers wet areas in more detail.
FAQ
Are kitchen cabinets from China cheaper than local joinery in Australia?
Usually, for a full house. The factory price for custom cabinetry made in Foshan is often a quarter to a third of a local installed quote. After freight, GST, port charges, local installation and contingency, a whole-house order typically ends up around 30% to 50% below a comparable local custom quote. Small single-room orders save much less.
How much does joinery cost for a 4-bedroom house in Australia?
For a mid-range kitchen, butler’s pantry, robes, vanities and laundry, local custom joinery often costs around AUD 46,000 to 107,000 installed, before benchtops and appliances. Flat-pack for the same rooms is often AUD 18,000 to 45,000 installed, with less flexibility on sizes and finishes.
What duty and GST apply to kitchen cabinets imported from China?
Wooden kitchen and bedroom furniture has a general duty rate of 5%. With a valid China–Australia Free Trade Agreement certificate of origin, goods made in China usually enter duty free. GST of 10% applies to the customs value plus duty, freight and insurance. Confirm the classification with your customs broker.
Is flat-pack a better option than importing custom cabinets?
Flat-pack is often the cheapest option up front and quick to buy, which suits simple layouts that fit standard sizes. Custom cabinets from China cost a little more than most flat-pack fit-outs but are made to your exact sizes, finishes and hardware, which often suits whole-house projects better.
How long does it take to get kitchen cabinets from China?
Allow about 12 to 20 weeks from final drawings to installation. That includes samples and approvals, 4 to 6 weeks of production, 3 to 5 weeks for shipping and clearance to the east coast, and installation. Local custom joinery is usually 8 to 14 weeks.
Can I import stone benchtops with my cabinets?
You cannot import engineered stone benchtops, which have been prohibited imports since 1 January 2025. Natural stone, porcelain and sintered stone can be options, but most projects template and fit benchtops locally after the cabinets are installed, so the tops match the built cabinets exactly.
Do imported cabinets need to meet Australian standards?
Yes. AS 4386 sets minimum requirements for cabinetry in kitchens and built-in furniture. You should also specify E0 or E1 rated boards with emission test reports, moisture-resistant board in wet areas, and electrical items suitable for Australia. Your builder and installer check the finished work on site.
Who installs kitchen cabinets imported from China?
A local cabinet installer or carpenter usually assembles and fits imported cabinets, with a licensed plumber and electrician for fit-off. Book them early, give them the assembly plans and labelling system, and include installation in your cost comparison from the start.
Comparing joinery quotes for a new home or renovation?
Send us your plans or joinery drawings. We will price the kitchen, robes, vanities and laundry with factories in Foshan, check boards, hardware and finishes against Australian requirements, and inspect production and packing, so your cabinets arrive on time, fit on site and land at a cost you can plan around.
Book a video callRelated reading
- Import kitchen cabinets and wardrobes from China to Australia
- Importing kitchen cabinets to Australia
- Wardrobes from China to Australia
- Importing furniture from China to Australia
- Sourcing kitchen cabinets from China
- The real cost of importing furniture from China
Prices in this guide are indicative typical ranges for planning, not quotes. This guide gives general information only and is not legal, customs or building compliance advice. Duty rates, biosecurity conditions and state building rules change. Check current requirements with your customs broker, builder and certifier before ordering. Last reviewed November 2026.








